We have good news. After a discussion with our electrical contractor today, it looks like we will be done with the electrical build out at the end of next week. This means we will be able to sell colocation services again on July 1 and dedicated servers for July 10. Currently, those are just estimated dates, but if everything goes as planned, we should be able to put those dates in stone shortly.
Currently we have the cabinets in, ready to be put in place tomorrow and over the weekend. The ladder rack is all in place, as well as most of the grounding cables. Power has been pulled in from the UPS to our breaker panels. Now the breakers and power distribution need to be completed and the wires need to be run to the cabinets. Since all the conduit and wire troughs are already up, that should not be a major undertaking. Then the cabinets get connected to the grounding cables, the outlets get put in and we're all set.
Comments (0)
Leave a Comment